Electrical - 2012 ~ by Griz (aka Steve Stovner) ~
The building will be powered by a 10 gage 220vac underground line run from the old pump house. Until the trench is dug (planned for summer of 2013), I am using a overhead 12 gauge 120vac line that I strung from the light pole outlet across the driveway.
The breaker box is a sub-panel (without a "main" breaker). Currently (Nov 2012) it has 4 active circuits:
Four 220vac lines are run from the breaker box to covered steel termination boxes (2 each on east and west walls). As I need them I will add the appropriate size breaker and hook it up to the line of choice. Then I can run flex conduit from the termination box to the equipment I want to power (e.g. Pump)