2013 ~ by Griz (aka Steve Stovner) ~
The old pump-house was a mess. Too small, rotting away, leaking roof, what little insulation it had was torn up by rodents and the well head was external.
After tearing down the old pump-house we moved all the equipment to the new pump-house. then removed the concrete pad it was on, buried the line stubs, painted the well head, installed the water manifold, installed the electrical and built the new Well-Head house.
Feb 2024
Copyright WaterBrother inc. © 2000 to Present
All Rights Reserved